Automatic Concrete Block Making Machine - Automatic Block Making Machine QT5-20A4 (Patents) – Shifeng
Automatic Concrete Block Making Machine - Automatic Block Making Machine QT5-20A4 (Patents) – Shifeng Detail:
Models | QT5-20A3 | QT5-20A4 |
Pallet Size | 1150x580x(10-25)mm | 1150x620x(10-25)mm |
Vibration Frequency | 50-70HZ / 76KN | 50-70HZ / 86KN |
Circle time | 14-20s (depend on different production) | 14-20s (depend on different production) |
Install power | 28kw | 38KW |
Water | 3.8m3/h | 3.8m3/h |
Production height | 50-200mm | 50-200mm |
Machine weight | 7T | 7.5T |
The whole Factory Sqm (producing+curing area+batching) | 580m2 (260+260+60) | 580m2 (260+260+60) |
Production storage sqm (2 shift/ day ,30days) | 4000m2 | 4000m2 |
Raw material sqm | 360m2 | 360m2 |
Row material | crushed stone, sand, cement, dust and coal fly ashcinder, slag, gangue, gravel, perlite. and other industrial wastes. | |
Applied products | concrete blocks, solid/hollow/cellular masonry products, paving stoneswith or without face mix, garden and landscaping products, slabs,curbstones, grass blocks, slope blocks, interlocking blocks, etc | |
Applied fields | widely used in buildings, road pavers, squares, gardens, landscaping, city constructions, et | |
ALL KINDS OF BLOCKS CAN MAKE | ||
Product detail pictures:
Related Product Guide:
We aim to find out quality disfigurement from the production and supply the best service to domestic and overseas customers wholeheartedly for Automatic Concrete Block Making Machine - Automatic Block Making Machine QT5-20A4 (Patents) – Shifeng , The product will supply to all over the world, such as: Uruguay , Italy , Azerbaijan , The working experience in the field has helped us forged a strong relations with customers and partners both in domestic and international market. For years, our products have been exported to more than 15 countries in the world and have been widely used by customers.
By Kelly from Johannesburg - 2018.12.11 14:13
This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
By Tony from Armenia - 2017.04.28 15:45
Write your message here and send it to us